Suzhou Electric Appliance Research Institute
期刊號(hào): CN32-1800/TM| ISSN1007-3175

Article retrieval

文章檢索

首頁(yè) >> 文章檢索 >> 往年索引

特高壓變電站隔離刀閘二次回路若干問(wèn)題分析及改進(jìn)

來(lái)源:電工電氣發(fā)布時(shí)間:2020-10-23 16:23 瀏覽次數(shù):757
特高壓變電站隔離刀閘二次回路若干問(wèn)題分析及改進(jìn)
 
劉濤,裴東良,楊征,王卓,田蕊
(國(guó)網(wǎng)河南省電力公司檢修公司,河南 鄭州 450051)
 
    摘 要:針對(duì)超(特)高壓變電站和換流站隔離、接地刀閘設(shè)備暴露出的問(wèn)題及缺陷,總結(jié)了刀閘二次回路若干問(wèn)題并提出改進(jìn)措施。為防止電機(jī)電流串入控制回路而燒損元器件,刀閘控制回路宜與電機(jī)回路電源獨(dú)立;氣體封閉絕緣組合電器(GIS)間隔整流器出口宜設(shè)置平衡電阻橋接地,以便于維護(hù)檢修工作;刀閘輔助接點(diǎn)不宜閉鎖斷路器合閘,以確保斷路器合閘控制回路的可靠性;針對(duì)長(zhǎng)期帶電的電子式熱繼電器易燒損,接有長(zhǎng)電纜的刀閘電機(jī)接觸器易發(fā)生誤動(dòng)事故,提出了電源接線等改進(jìn)方案;指出測(cè)控裝置出口繼電器接點(diǎn)性質(zhì)應(yīng)與控制回路電源性質(zhì)一致,并針對(duì)GIS間隔溫濕度控制器與加熱器分散布置的缺點(diǎn)給出改進(jìn)意見(jiàn)。為刀閘設(shè)備的生產(chǎn)制造、系統(tǒng)設(shè)計(jì)和現(xiàn)場(chǎng)運(yùn)維檢修工作提供了參考。
    關(guān)鍵詞:超(特)高壓變電站;隔離刀閘;接地刀閘;控制回路;平衡電阻橋;電子式熱繼電器
    中圖分類號(hào):TM564;TM63     文獻(xiàn)標(biāo)識(shí)碼:B     文章編號(hào):1007-3175(2020)10-0032-07
 
Analysis and Improvement on Problems in Secondary Circuit of Disconnector in UHV Substations
 
LIU Tao, PEI Dong-liang, YANG Zheng, WANG Zhuo, TIAN Rui
(Maintenance Company of Henan Electric Power Corporation, Zhengzhou 450051, China)
 
    Abstract: For the problems of disconnector and earthing switches in EHV (UHV) substation and converter station, this paper summarizes some problems in the secondary circuit of switches and puts forward improvement measures. In order to prevent the motor current flow in series to the control circuit and burn the components, the switches control circuit and motor circuit should be seperately power supplied. The earthing balance resistance bridge should be installed at the outlet of GIS unit’s rectifier to facilitate maintenance and repair work. To ensure the reliability of circuit breaker closing control circuit, the auxiliary contact of switches should not block the closing operation of circuit breaker. For the long-term electrified electronic thermal relay is frequently burnt, and the switches motor contactor connected with long cable is easy to wrong operation, the power wiring and other improvement schemes are proposed. The nature of outlet relay contacts should be consistent with that of control circuit power supply. Disadvantage and suggestion of decentralized arrangement of GIS unit’s temperature & humidity controller and its heater is put forward. It provides a reference for the manufacture, system design and on-site operation and maintenance of switchgear.
    Key words: EHV(UHV) substation; disconnector; earthing switch; control circuit; balanced resistance bridge; electronic thermal relay
 
參考文獻(xiàn)
[1] 張書琴,張克選,高延峰,等. GIS現(xiàn)場(chǎng)驗(yàn)收及運(yùn)行中若干問(wèn)題的研究[J]. 高壓電器,2017,53(5):193-199.
[2] 劉濤,裴東良,徐瑞娜,等.1 000 kV HGIS隔離/ 接地刀閘控制觸點(diǎn)頻繁燒損事故分析及改進(jìn)[J]. 華北電力技術(shù),2017(5):60-65.
[3] 劉濤,李鳳旭,楊光,等. 直流不接地系統(tǒng)臨時(shí)接地裝置在特高壓南陽(yáng)變電站的應(yīng)用[J]. 電氣應(yīng)用,2015,34(1):116-119.
[4] 李茹勤,劉濤,張高峰,等. 整流器出口設(shè)置平衡電阻橋接地方案的研究[J]. 東北電力技術(shù),2018,39(7):18-21.
[5] 李煒,劉明光,田浩,等. 隔離開關(guān)傳動(dòng)機(jī)構(gòu)的誤差分析與研究[J]. 高壓電器,2018,54(3):32-36.
[6] 劉濤,王貴山,黃健金,等.500 kV斷路器合閘回路故障引起的保護(hù)誤動(dòng)事故分析[J]. 陜西電力,2014,42(6):77-80.
[7] 梁方建,吳建輝,胡路東,等. 一起220 kV隔離開關(guān)電機(jī)開關(guān)誤分事故分析[J]. 高壓電器,2018,54(1):249-251.
[8] 雷興,潘學(xué)萍,孫彬,等. 電纜分布電容對(duì)出口繼電器動(dòng)作的影響分析及應(yīng)對(duì)措施[J]. 電力系統(tǒng)自動(dòng)化,2017,41(15):170-175.
[9] 馮順, 曲欣, 王毅, 等. 一起刀開關(guān)誤動(dòng)作引起500 kV線路跳閘的分析[J]. 電氣應(yīng)用,2018,37(9):54-57.
[10] 孟恒信. 出口繼電器安全動(dòng)作功率分析[J]. 電力系統(tǒng)自動(dòng)化,2009,33(6):104-107.
[11] 劉若溪,白寶軍,郭沁,等. 開關(guān)柜凝露現(xiàn)象機(jī)理分析研究[J]. 高壓電器,2018,54(10):80-84.