核電站中壓電氣貫穿件電氣試驗(yàn)參數(shù)選擇探討
俞高偉1,張甬2
(1 上海發(fā)電設(shè)備成套設(shè)計(jì)研究院有限責(zé)任公司,上海 200240;2 中廣核工程有限公司,廣東 深圳 518124)
摘 要:以防城港二期核電工程電氣貫穿件相關(guān)技術(shù)要求為基礎(chǔ),介紹了華龍一號(hào)核電站電氣貫穿件的功能,比對(duì)了GB/T 13538—2017、IEEE 317-2013、GB/T 25837—2010等相關(guān)標(biāo)準(zhǔn)對(duì)中壓電氣貫穿件的要求,探討中壓電氣貫穿件電氣試驗(yàn)的參數(shù)選擇,以期為電氣貫穿件的國(guó)產(chǎn)化的設(shè)計(jì)、制造和鑒定提供借鑒和參考。
關(guān)鍵詞:華龍一號(hào)核電站;電氣貫穿件;工頻耐壓試驗(yàn);脈沖電壓試驗(yàn);局部放電試驗(yàn)
中圖分類(lèi)號(hào):TM506 文獻(xiàn)標(biāo)識(shí)碼:B 文章編號(hào):1007-3175(2018)11-0049-03
Discussion on Selection of Electric Test Parameters of Medium Voltage Electrical Penetration
Assembly in Nuclear Power Plant
YU Gao-wei1, ZHANG Yong2
(1 Shanghai Power Equipment Research Institute Co., Ltd, Shanghai 200240, China;
2 China Nuclear Power Engineering Co., Ltd, Shenzhen 518124, China)
Abstract: Based on the relevant technical requirements of electrical penetration assembly of Fangchenggang second phase nuclear power project, this paper introduced the function of electrical penetration assembly of Hua-long pressurized reactor and compared the different requirements of GB/T 13538—2017, IEEE 317-2013, GB/T 25837—2010 and other related standards for medium voltage electrical penetration assembly, discussing the selection of parameters for electric test of medium voltage electrical penetration assembly, which provides the references for the design, manufacture and identification of localized electrical penetration assembly.
Key words: HPR1000 (Hua-long pressurized reactor); electrical penetration assembly; power frequency voltage test; impulse voltage test; partial discharge test
參考文獻(xiàn)
[1] 中國(guó)電力企業(yè)聯(lián)合會(huì). 核電站安全殼電氣貫穿件:GB/T 13538—2017[S]. 北京:中國(guó)標(biāo)準(zhǔn)出版社,2017:10-11.
[2] 中國(guó)電力企業(yè)聯(lián)合會(huì). 交流電氣裝置的過(guò)電壓保護(hù)盒絕緣配合設(shè)計(jì)規(guī)范:GB/T 50064—2014[S]. 北京:中國(guó)計(jì)劃出版社,2014:7-45.
[3] 俞高偉,胡子?jì)?,吳珂科,朱小平AP1000中壓電氣貫穿件合格鑒定電氣試驗(yàn)要求[J]. 發(fā)電設(shè)備,2013,27(2):142-144.
[4] 鄭開(kāi)云. 核電廠中壓電氣貫穿件短路電動(dòng)力試驗(yàn)探討[J]. 電工電氣,2017(6):51-54.