遠(yuǎn)傳業(yè)務(wù)一體化可行性研究
劉慶偉,蘇國(guó)瀧,尤存,徐波
寧夏電力公司中衛(wèi)供電公司,寧夏 中衛(wèi) 755000
摘 要:為推進(jìn)電網(wǎng)二次系統(tǒng)一體化建設(shè)及二次專業(yè)的橫向融合與縱向貫通,從功能定位及數(shù)據(jù)采集、處理、存儲(chǔ)、轉(zhuǎn)發(fā)與源端維護(hù)和分布式應(yīng)用等方面研制了具有遠(yuǎn)傳一體化功能的智能數(shù)據(jù)網(wǎng)管機(jī)。給出了硬件、軟件設(shè)計(jì)方案,預(yù)測(cè)了該裝置的試驗(yàn)運(yùn)行情況,并針對(duì)智能數(shù)據(jù)網(wǎng)管機(jī)涉及多個(gè)專業(yè)業(yè)務(wù)的交叉的特點(diǎn),提出了一種新的二次專業(yè)融合管理模式。
關(guān)鍵詞:二次系統(tǒng)一體化;智能數(shù)據(jù)網(wǎng)管機(jī);二次專業(yè)融合管理模式
中圖分類號(hào):TM734 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1007-3175(2016)02-0054-03
Feasibility Research on Tele-Transmission Business Integration
LIU Qing-wei, SU Guo-long, YOU Cun, XU Bo
Zhongwei Power Supply Company of Ningxia Electric Power Company, Zhongwei 755000, China
Abstract: In order to boost power grid secondary system integrated construction and secondary specialized crosswise mixing and lengthways cut-through, this paper developed an intelligent data network management machine with tele-transmission integrated functions from the respects of functional orientation, data acquisition, data disposing, data storage, data transmitting, source end maintenance and distributed application and gave the designing plan of hardware and software, predicting test running condition of the device. In allusion to the feature that the intelligent data network management machine involved multiple specialized crossed businesses, this paper raised a new kind of secondary specialized mixing management mode.
Key words: secondary system integration; intelligent data network management machine; secondary specialized mixing management mode
參考文獻(xiàn)
[1] 汪際峰.一體化電網(wǎng)運(yùn)行智能系統(tǒng)的概念及特征[J].電力系統(tǒng)自動(dòng)化,2011,35(24):1-6.
[2] 王文龍,胡榮,張喜銘,等.二次一體化框架下變電站站控層體系架構(gòu)探討[J].電力系統(tǒng)自動(dòng)化,2013,37(14):113-116.
[3] 周華鋒,李鵬,吳小辰.二次一體化框架下智能遠(yuǎn)動(dòng)機(jī)建設(shè)初步方案[J].南方電網(wǎng)技術(shù),2012,6(3):69-72.
[4] 張金江,郭創(chuàng)新,曹一家,等.基于MAS的變電站信息一體化嵌入式平臺(tái)設(shè)計(jì)[J].電力系統(tǒng)自動(dòng)化,2008,32(9):52-56.
[5] 章堅(jiān)民,趙舫,馬傳思.嵌入式變電站智能信息與數(shù)據(jù)服務(wù)器的設(shè)計(jì)與開發(fā)[J].電力系統(tǒng)自動(dòng)化,2005,29(9):50-54.
[6] 張勇,賈德順,鄒國(guó)惠,等.XML數(shù)據(jù)庫(kù)在IEC 61850裝置實(shí)時(shí)數(shù)據(jù)庫(kù)中的應(yīng)用[J].電力系統(tǒng)自動(dòng)化,2013,37(20):132-135.
[7] HUGHES J.Harmonization of IEC 61970, 61968, and 61850 Models[R].California:Electric Power Research Institute(EPRI),2006.
[8] BECKER D.Harmonizing the International Electrotechnical Commission Common Information Model(CIM) and 61850[R].California:Electric Power Research Institute(EPRI),2010.